• strict warning: Only variables should be passed by reference in /var/www/vhosts/imathia.es/httpdocs/sites/all/modules/contrib/date/date/date.theme on line 255.
  • strict warning: Only variables should be passed by reference in /var/www/vhosts/imathia.es/httpdocs/sites/all/modules/contrib/date/date/date.theme on line 260.
  • strict warning: Only variables should be passed by reference in /var/www/vhosts/imathia.es/httpdocs/sites/all/modules/contrib/date/date/date.theme on line 261.
  • strict warning: Only variables should be passed by reference in /var/www/vhosts/imathia.es/httpdocs/sites/all/modules/contrib/date/date/date.theme on line 255.
  • strict warning: Only variables should be passed by reference in /var/www/vhosts/imathia.es/httpdocs/sites/all/modules/contrib/date/date/date.theme on line 260.
  • strict warning: Only variables should be passed by reference in /var/www/vhosts/imathia.es/httpdocs/sites/all/modules/contrib/date/date/date.theme on line 261.
  • strict warning: Only variables should be passed by reference in /var/www/vhosts/imathia.es/httpdocs/sites/all/modules/contrib/date/date/date.theme on line 255.
  • strict warning: Only variables should be passed by reference in /var/www/vhosts/imathia.es/httpdocs/sites/all/modules/contrib/date/date/date.theme on line 260.
  • strict warning: Only variables should be passed by reference in /var/www/vhosts/imathia.es/httpdocs/sites/all/modules/contrib/date/date/date.theme on line 261.
  • strict warning: Only variables should be passed by reference in /var/www/vhosts/imathia.es/httpdocs/sites/all/modules/contrib/date/date/date.theme on line 255.
  • strict warning: Only variables should be passed by reference in /var/www/vhosts/imathia.es/httpdocs/sites/all/modules/contrib/date/date/date.theme on line 260.
  • strict warning: Only variables should be passed by reference in /var/www/vhosts/imathia.es/httpdocs/sites/all/modules/contrib/date/date/date.theme on line 261.

Roadbed construction for the High Speed Line Madrid-Galicia. Section: O Cañizo Tunnel. Right Track

Location : Ourense (Galicia)
Start Date : 10 February 2012
End Date : 11 February 2015
Budget : € 73,562,477
Status :

Overview

Normal 0 21 false false false ES X-NONE X-NONE

This project consists in the platform construction of a stretch of 6.64 Km of new High Speed railway line Madrid-Galicia, in the section O Cañizo Tunnel. Right track.

Key facts: 66.87% of the length of path is disposed in tunnel and 1.25% in the surface, leaving the remaining length of 31.87% for the cosntruction of the station "Puerta de Galicia"

Proyected tunnel characteristics are: 55372.219 m tunnel on right track, located in the municipal area of A Gudiña between Km Points 200+249,389 and 205+621,608

 

images.jpeg Planos 65.jpg